Run your product idea through the exact 3-stage validation framework used by our Phase 1 Specialists. Get a score out of 10, a GO / ITERATE / KILL decision, and a full written report — in under 60 seconds.
Every idea runs through all 3 stages. Each stage has clear pass criteria. If a stage fails, the idea stops or iterates.
Market size, Google Trends analysis, competitor traffic — must pass 3 of 4 mandatory checks.
Macro checklist, Ecom Pyramid positioning, differentiation opportunity, and demand signals.
Hard gates: 30% minimum gross margin and ≤25% budget risk exposure. No exceptions.
No opinions. No overrides. The data decides.
All 3 stages passed. Product has validated demand, clear differentiation, and meets financial thresholds. Ready to proceed.
2 of 4 Stage 1 criteria met, or weak Stage 2 data. Adjust niche scope, angle, or product positioning and re-validate.
≤1 Stage 1 criteria met, or Stage 3 financial hard gates failed. Do not proceed. Select a new niche or product.
Deep market research and competitor analysis in seconds, not hours.
Score out of 10 based on weighted criteria across all three stages.
30% margin and 25% risk rules are enforced automatically — no overrides.
GO / ITERATE / KILL with specific next steps and red flags identified.
Takes 2 minutes to fill in. Results in under 60 seconds.